Public records/ordinance
Reviewed public record
Source-Ord-1700 A1-1076
The viewer displays the reviewed public copy. The restricted source file is not available through this page.
Accessible text transcription
Reviewed text from the public copy. Consult the displayed document and custodian for authoritative wording.
Page 1
ORDINANCE NO. 1-766
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF PRICHARD, ALABAMA, AS FOLLOWS:
ORDINANCE NO. 1569 IS HEREBY AMENDED TO READ AS FOLLOWS:
SECTION 1. In addition te all fees, licenses, charges, assessments of
any kind or nature which are presently charged or levied by the City of Prichard,
there is hereby levied and assessed the following building permit fees as
follows:
(1) On all buildings, structures, or alterations requiring a building
permit as set forth in Ordinance No: 959 and No: 974; a fee shall be paid as
required at the time of filing the application, in accordance with the following.
(2) Permit Fees: .
a. Where the valuation does not exceed $100:00, no fee shall be
required unless an inspection is necessary, in which case
there shall be a $15.00 fee:
b. For a valuation over $100:00, up to and including $15,000.00,
the fee shall be $3.00 per thousand or fraction thereof.
ce. For a valuation over $15,000.00, up to and including $100,00.00,
the fee shall be $45.00 for the first $15,000.00 plus $2.00 for
each additional thousand or fraction thereof.
d. For a valuation over $100,000.00, up to and including $500,000.00,
the fee shall be $215/00 for the first $100,000.00 plus $1.00 for
each additional thousand or fraction thereof.
e. For a valuation over $500,000.00, up to and including $1,000,000.00,
the fee shall be $615.00 for the first $500,000.00, plus $.40 for
each additional thousand or fraction thereof.
£. For a valuation over $1,000,000.00, the fee shall be $815.00 for
first million plus $.15 for each additional thousand or fraction
thereof.
g- 1/4 of 1% of total evaluation shall be added to the above, applying
to Contractors only.
h. The 1/4 fee of total evaluation shall not be applied to home owners.
2 -i- Residential brick veneer type structures per square
foot of living area~~---------~~-----~~-----~--~----- $14.00
Residential frame type structures per square foot
of living area~----------~~-----~+-~~---~------------- $14.00
Garages, carports and other unfinished additions
per square foot of covered area~----~----~----------- $ 7.00
Roofing - per square foot of structure (not roof area)$ .75
Page 2
(3)
(4)
-2-
Commercial buildings (except unfinished warehouse
type structures) per square foot---~---~---~---~_.-___ $17.50
Unfinished commercial buildings used as a warehouse
for storage and not opened for general business, per
square fo0t woo nnn nnn nnn nietniaiaintaiateted $ 8.00
Unfinished plants to be used for manufacturing
products, per square foot---~--~---------=~--~--.--__ $ 7.00
Unfinished garage or auto repair type structures
per square foot-----------~--~---~~------~--.--~----- $ 7.00
MOVING OF BUILDINGS OR STRUCTURES.
a- For the moving of any building or structure, the fee shall be $30.00
DEMOLITION OF BUILDINGS OR STRUCTURES. '
a. For the demolition of any building or structure, the fee shall be
$15.00 per story of building:
SECTION 2.
assessed by the City of Prichard, in addition to all other fees which are now
hereby levied, imposed or assessed, to-wit:
The following plumbing fees are hereby levied, imposed and
a. Issuance of permit $10.00
b. Each fixture unit $ 3.00
c. Sewer (new, extension or replacement) $ 3.00
d. Water service $ 3.00
e. Installation, alteration or repair
of water piping and/or water treating
equipment except on Public right-of-way $ 3.00
f. Repair/alteration of drainage or vent
piping $ 3.00
g. Hach inspection $ 5.00
h. Each additional inspection $ 7.00
i. Manufactured Building Act #81-706,
Section V(8) ~ installation
Permit (this does not include
plumbing site work) $50.00
SECTION 3. There are hereby levied the following electrical fees in
addition to all such fees hereby presently levied, imposed or assessed:
MAIN SERVICE AND SERVICE REPAIRS
aE REP BIRS
200
400
600
800
1200
1600
2000
ampere
ampere
ampere
ampere
ampere
ampere
ampere
switch or less.....$10.00 TEMPORARY SERVICE $10.00
switch. .....0.+.04+$12.00
switch. ......ee.++s$815.00
switch. ......0.00+2820.00
switch.............$25.00 REPAIRS TO OUTLETS
switch. ......00002+$30.00 OR FIXTURES $10.00
switch. ......0.40+4840.00
Page 3
wae
-3-
OUTLETS : FIXTURES & LAMPHOLDERS
Li BececceccccccceccceeneeceeeS 4,00 1 - 10.....0...2256.8 5.00
4 lO. cece cere cece cence eeeeeS 5.00 Ll - 20.............8 7.50
LL - UB. e eee c cere eee e newer eee 7000 21 — B30... cece eee ee eS 9225
LO = 24 ec cwwec cece cneceecceceeeeSlO.00 31 - 40.............810.50
25 = SO. cece cece cece cece ee enn eee Sl5.00 41 - 50...........4.813.75
SL — Pa cccewccnccencccesceeee ee $20.00 5L ~ 60.......2..002$18.00
76 = LOO. cee cece eee ween eee ee $30000 Gl - 70..... 0.0200 e 2 $20.00
LOL ~ 50... ee eee ee ee eee eee eee $40.00 71 = BO... eee e ee $22.00
USL — 200... 0... . eee ee ee eee cece eee $50.00 B81 - 90.............$25.00
91 - 100............$30.00
Plus $.40 each over 200 Plus $.40 per each fixture over 100
MOTOR INSPECTION FEES: HEATING:
Fractional - 1 HP........0.+---$ 5.00 ‘0.0 kw to 7.9 kw....$ 5.00
Ls ~ 3 APL. eee wee e eee S 6.00 8.0 kw to 14.9 kw...$ 8.00
4 ~— 10 BP. . wee c eee uses 8.675 15.0 kw to 22.9 kw...$10.00
11 * 20 HP. cee ewes een ee SLL.50 23.0 kw to 37.9 kw...$15.00
21 — 30 HP... eee eee ee S13275 38.0 kw to 74.9 kw...$20.00
31 — 5O HP.w ee ewes een ee e 815.50
§1 ~ 100 HP... cece eee eee S17250 ELECTRIC SIGNS:
Above 100 HP $17.50 plus $.20
per each horsepower over 100 Sign connection fee...$10.00
Sign shop insp. fee...$ 5.00
(per transformer or ballast)
Incandescent Lamps to be charged
according to motor schedule.
AIR_ CONDITIONERS
Window air conditioners and central units to 4 tons.........$10.00
over 4 tons - $1.00 each ton.
APPLIANCES, INC.
REPALTS.. sees eeeeeeeeecccenee $10.00 Other current consuming devices
Welding Machine Receptacle....$10.00 to be charged for as motors.
RANGE. oc ew cece ccsnccccsnesveedS 6200 (Multiply amperes by voltage and
DEVO. cee w cece ecccaccencecseeedS 5.00 reduce to horsepower by dividing
Water Heater. .....cceeccceeneeS 5.00 746 watts).
Each Generator..Use motor schedule
and add $2.00
SYSTEMS: Non-Residential and Commercial.....$20.00
Residential...... cece cece eee ec ene $10.00
INVESTIGATION PEE... ..se0ee002-$10.00
POOL FEB... ssc cere ccncceeeveeee Sl10.00
TRANSFORMERS (1 kw or over)....$ 5.00
108.6 - Fees for Reinspections.
Page 4
ae
‘og
-4-
A reinspection fee shall be charged whenever an inspection is requested
and the work is found to be not ready for inspection; or is improperly
installed. The amount of said reinspection fee shall be $5.00 for each
reinspection.
108.5 - Fees for Late Permits Double normal fee.
Manufactured Building Act #81-706 Section V (8)
Installation Permit...2...20 2125022
{Does not include premise wiring)
Fees under Section 103
103.3 (b) $5.00 Maintenance Electrican
103.3 (d) $5.00 Journeyman, and or duplicate
103.3 (e) $10.00 Master Electrician
103.3 (£) $5.00 Inactive Master
SECTION 4. For the installation of heating and cooling units, the Inspection
Permit Fees shall be as follows:
(5) Inspection Permit Fees:
a. Installation of Air Conditioning - Heating Systems in
single family residences... ees lle $30.00
b. Installation of Air Conditioning Heating Systems in
apartments (per unit). iiiil... 2815.00
¢. Installation of Air Conditioning ~ Heating Systems in
duplexes (each)......521102
Coreen r ecw rce een nne eee s 815400
dad. Installation of Air Conditioning - Heating Systems in
single occupancy buildings $10.00 per tenant space
plus $4.00 per ton or rated horse power or fraction
thereof
e. Systems in buildings of multi-occupancies are considered
separate systems.
£. Installation of heating - ventilating systems, add-on,
and repairs to SYSTEMS... eee cece cee wc c nee ew ce een ces ce $15.00
g. Ona job started before a permit is obtained, the fee
shall be doubled.
h. Boilers based on B.T.U. input
33,000 B.T.U. (1 BHP) to 165,000 (5 BHP). oe. e wee eee $10.00
165,001 B.T.U. (5 BHP) to 330,000 B.T.U. (10 BHP).......$15.00
330,001 B.T.U. (10 BHP) to 1,165,000 (52 BHP)...2.......$25.00
1,165,001 B.T.U. (52 BHP) to 3,300,000 (98 BHP).........$35.00
Over 3,300,000 BeLiUe wee l eee cece ec cc ence cece nccscnaes 0 $45.00
Investigation Ba BT)
Page 5
NOTE: B:-
-5-
Commercial equipment change-outs same as new work:
NOPE-As Any equipment change-outs (replacement units)
will be brought up to meet the Mechanical Code.
Adding on of duct work 20'.or 3 Branch Lines/or
seenee s wee eweeceseseeS 7.50
This fee shall be paid in addition to the Building Permit Fee
as required by the Building Code of City of Prichard.
A K. NORWOOD, CITY CLERK-TREASURER

