Page 1
FLOOD DAMAGE PREVENTION ORDINANCE
City of Prichard
Ordinance #_ Qpx]3
ARTICLE 1
Statutory Authorization, Findings of Fact, Purpose And Objectives
SECTION A STATUTORY AUTHORIZATION
The Legislature of the State of Alabama has in Title 11, Chapter 19, Sections 1-24, Chapter 45,
Sections 1-11, Chapter 52, Sections 1-84, and Title 41, Chapter 9, Section 166 of the Code of
Alabama, 1975, authorized local government units to adopt regulations designed to promote the
public health, safety, and general welfare of its citizenry. Therefore, the City Council, of City of
Prichard, Alabama, does ordain as follows:
SECTION B FINDINGS OF FACT
(1) The flood hazard areas of Prichard, Alabama are subject to periodic inundation which
results in loss of life and property, health and safety hazards, disruption of commerce and
governmental services, extraordinary public expenditures for flood relief and protection, and
impairment of the tax base, all of which adversely affect the public health, safety and
general welfare.
(2) These flood losses are caused by the occupancy in flood hazard areas of uses vulnerable to
floods, which are inadequately elevated, flood proofed, or otherwise unprotected from flood
damages, and by the cumulative effect of obstructions in floodplains causing increases in
flood heights and velocities.
SECTION C STATEMENT OF PURPOSE
It is the purpose of this ordinance to promote the public health, safety and general welfare and
to minimize public and private losses due to flood conditions in specific areas by provisions
designed to:
(1) require that uses vulnerable to floods, including facilities which serve such uses, be
protected against flood damage at the time of initial construction;
(2) restrict or prohibit uses which are dangerous to health, safety and property due to water or
erosion hazards, or which increase flood heights, velocities, or erosion;
Page 2
FLOOD DAMAGE PREVENTION ORDINANCE
© G) control filling, grading, dredging and other development which may increase flood damage
or erosion;
(4) __ prevent or regulate the construction of flood barriers which will unnaturally divert flood
waters or which may increase flood hazards to other lands; and
(5) control the alteration of natural floodplains, stream channels, and natural protective barriers
which are involved in the accommodation of flood waters.
SECTION D OBJECTIVES
The objectives of this ordinance are:
(1) to protect human life and health;
(2) to minimize damage to public facilities and utilities such as water and gas mains, electric,
telephone and sewer lines, streets and bridges located in floodplains;
(3) to help maintain a stable tax base by providing for the sound use and development of flood
prone areas in such a manner as to minimize flood blight areas,
(4) to minimize expenditure of public money for costly flood control projects;
(5) to minimize the need for rescue and relief efforts associated with flooding and generally
undertaken at the expense of the general public;
(6) to minimize prolonged business interruptions, and
(7) to ensure that potential home buyers are notified that property is in a flood area,
ARTICLE 2
GENERAL PROVISIONS
SECTION A LANDS TO WHICH THIS ORDINANCE APPLIES
This ordinance shall apply to all Areas of Special Flood Hazard within the jurisdiction of City of
Prichard, Alabama.
SECTION B BASIS FOR AREA OF SPECIAL FLOOD HAZARD
The Areas of Special Flood Hazard identified by the Federal Emergency Management Agency in its
Flood Insurance Study (FIS), dated June 5, 2020, with accompanying maps and other supporting
2/7/2019 pg] 2
Page 3
Ne,
FLOOD DAMAGE PREVENTION ORDINANCE
data and any revision thereto, are adopted by reference and declared a part of this ordinance. For
those land areas acquired by a municipality through annexation, the current effective FIS and data
for Mobile County are hereby adopted by reference. Areas of Special Flood Hazard may also
include those areas known to have flooded historically or defined through standard engineering
analysis by governmental agencies or private parties but not yet incorporated in the FIS.
When Preliminary Flood Insurance Studies and Flood Insurance Rate Maps have been provided by
FEMA to the City of Prichard:
(L) Prior to the issuance of a Letter of Final Determination (LFD) by FEMA, the use of the
preliminary flood hazard data shall only be required where no base flood elevations
and/or floodway areas exist or where the preliminary base flood elevations or floodway
area exceed the base flood elevations and/or floodway widths in the effective flood
hazard data provided by FEMA. Such preliminary data may be subject to revision
through valid appeals.
(2) Upon the issuance of a Letter of Final Determination (LFD) by FEMA, the revised flood
hazard data shall be used and replace all previously effective flood hazard data provided
by FEMA for the purposes of administrating these regulations.
Where adopted regulatory standards conflict, the more stringent base flood elevation shall prevail.
Preliminary FIS data may be subject to change by a valid appeal.
SECTION C: ESTABLISHMENT OF A FLOODPLAIN DEVELOPMENT PERMIT
A Development Permit shall be required in conformance with the provisions of this ordinance
PRIOR to the commencement of any development activities in identified areas of special flood
hazard and community flood hazard areas within the community.
SECTION D. COMPLIANCE
No structure or land shall hereafter be located, extended, converted or altered without full
compliance with the terms of this ordinance and other applicable regulations.
SECTION E. ABROGATION AND GREATER RESTRICTIONS
This ordinance is not intended to repeal, abrogate, or impair any existing ordinance, easements,
covenants, or deed restrictions. However, where this ordinance and another conflict or overlap,
whichever imposes the more stringent restrictions shall prevail.
SECTION F. INTERPRETATION
In the interpretation and application of this ordinance all provisions shall be: (1) considered as
minimum requirements; (2) liberally construed in favor of the governing body, and (3) deemed
neither to limit nor repeal any other powers granted under state statutes.
SECTION G. WARNING AND DISCLAIMER OF LIABILITY
2/7/2019 pg {3
Page 4
O
FLOOD DAMAGE PREVENTION ORDINANCE
The degree of flood protection required by this ordinance is considered reasonable for regulatory
purposes and is based on scientific and engineering considerations. Larger floods can and will
occur; flood heights may be increased by man-made or natural causes. This ordinance does not
imply that land outside the Areas of Special Flood Hazard or uses permitted within such areas will
be free from flooding or flood damages. This ordinance shall not create liability on the part of
Prichard or by any officer or employee thereof for any flood damages that result from reliance on
this ordinance or any administrative decision lawfully made thereunder.
SECTION H. PENALTIES FOR VIOLATION
@)
(2)
Notice of Violation. If the community determines that an applicant or other responsible
person has failed to comply with the terms and conditions of a permit, or the provisions of
this ordinance, it shall issue a written notice of violation, by certified return receipt mail, to
such applicant or other responsible person. Where the person is engaged in activity covered
by this ordinance without having first secured a permit, the notice shall be served on the
owner or the responsible person in charge of the activity being conducted on the site. The
notice of violation shall contain:
(a) The name and address of the owner or the applicant or the responsible person;
(b) The address or other description of the site upon which the violation is occurring;
(c) A statement specifying the nature of the violation;
(d) A description of the remedial measures necessary to bring the action or inaction
into compliance with the permit or this ordinance and the date for the completion
of such remedial action;
(e) — Astatement of the penalty or penalties that may be assessed against the person to
whom the notice of violation is directed, and;
® A statement that the determination of violation may be appealed to the
community by filing a written notice of appeal within ten (10 ) days after the
notice of violation (except, that in the event the violation constitutes an
immediate danger to public health or public safety, 24-hour notice shall be
sufficient).
Additional Enforcement Actions. If the remedial measures described in the Notice of
Violation have not been completed by the date set forth for such completion in the Notice of
Violation, any one or more of the following enforcement actions may be enacted against the
person to whom the Notice of Violation was directed. Before taking any of the following
actions or imposing any of the following penalties, the City of Prichard shall first notify the
applicant or other responsible person in writing of its intended action. The City of Prichard
shall provide reasonable opportunity, of not less than ten days (except, that in the event the
violation constitutes an immediate danger to public health or public safety, 24-hour notice
shall be sufficient) to cure such violation. In the event the applicant or other responsible
person fails to cure such violation after such notice and cure period, the City of Prichard may
take or impose any one or more of the following enforcement actions or penalties:
(a) Stop Work Order: The community may issue a stop work order, which shall be
served on the applicant or other responsible person. The stop work order shall
2/7/2019 pg | 4
Page 5
O
(b)
(c)
GC)
(e)
2/7/2019
FLOOD DAMAGE PREVENTION ORDINANCE
remain in effect -until the applicant or other responsible person has taken the
remedial measures set forth in the notice of violation or has otherwise cured the
violation or violations described therein, provided the stop work order may be
withdrawn or modified to enable the applicant or other responsible person to
take the necessary remedial measures to cure such violation or violations.
Termination of water service and/or withhold or revoke Certificate of
Occupancy: The community may terminate utilities and/or refuse to issue and/or
revoke a certificate of occupancy for the building or other improvements and/or
repairs conducted or being conducted on the site until the applicant or other
responsible person has taken the remedial measures set forth in the notice of
violation or has otherwise cured the violation or violations described therein.
Suspension, revocation, or modifications of permit: The community may
suspend, revoke, or modify the permit authorizing the development project. A
suspended, revoked, or modified permit may be reinstated after the applicant or
other responsible person has taken the remedial measures set forth in the notice
of violation or has otherwise cured the violations described therein, provided
such permit may be reinstated (upon such conditions as the community may deem
necessary) to enable the applicant or other responsible person to take the
necessary remedial measures to cure such violations.
Civil penalties: Violation of the provisions of this ordinance or failure to comply
with any of its requirements, including violation of conditions and safeguards
established in connection with grants of variance or special exceptions shall
constitute a misdemeanor. Any person who violates this ordinance or fails to
comply with any of its requirements shall, upon conviction thereof, be fined not
more than {$500.00} or imprisoned for not more than {30} days, or both, and in
addition, shall pay all costs and expenses involved in the case: Each day such
violation continues shall be considered a separate offense. Nothing herein
contained shall prevent the City of Prichard from taking such other lawful actions
as is necessary to prevent or remedy any violation.
Section 1316 Declaration: Section 1316 of the National Flood Insurance Act
authorizes FEMA to deny flood insurance to a property declared by the State,
County, or Municipal government to be in violation of the local floodplain
management ordinance. A Section 1316 declaration shall be used when all other
legal means to remedy a violation have been exhausted and the structure is
noncompliant. Once invoked, the property's flood insurance coverage will be
terminated and no new or renewal policy can be issued; no flood insurance claim
can be paid on any policy on the property, and disaster assistance will be denied.
The declaration must be in writing (letter or citation), from the community to the
property owner and the applicable FEMA Regional Office, and must contain the
Sollowing items:
i. The name(s) of the property owner(s) and address or legal description of
the property sufficient to confirm its identity and location;
ii. Aclear and unequivocal declaration that the property is in violation of a
cited State or local law, regulation or ordinance;
iii, A-clear statement that the public body making the declaration has
authority to do so and a citation to that authority;
pe] 5
Page 6
(3)
(4)
6)
FLOOD DAMAGE PREVENTION ORDINANCE
iy. Evidence that the property owner has been provided notice of the
violation and the prospective denial of insurance; and
y. Aclear statement that the declaration is being submitted pursuant to
section 1316 of the National Flood Insurance Act of 1968, as amended.
If a structure that has received a Section 1316 declaration is made compliant
with the community's floodplain management ordinance, then the Section 1316
declaration can be rescinded by the community and flood insurance eligibility
restored.
Administrative appeal: judicial review. Any person receiving a Notice of Violation may
appeal the determination of the community, including but not limited to the issuance of a
stop work order, the assessment of an administratively-imposed monetary penalty, the
suspension, revocation, modification, or grant with condition of a permit by the community
upon finding that the holder is in violation of permit conditions, or that the holder is in
violation of any applicable ordinance or any of the community's rules and regulations, or the
issuance of a notice of bond forfeiture.
The Notice of Appeal must be in writing and must be received within ten (10) days from the
date of the Notice of Violation. A hearing on the appeal shall take place within thirty days
from the date of receipt of the Notice of Appeal by the Floodplain Administrator.
All appeals shall be heard and decided by the community's designated Appeal Board, which
shall be Board of Adjustment, or their designees. The Appeal Board shall have the power to
affirm, modify, or reject the original penalty, including the right to increase or decrease the
amount of any monetary penalty and the right to add or delete remedial actions required for
correction of the violation and compliance with the community's flood damage prevention
ordinance, and any other applicable local, state, or federal requirements. The decision of the
Appeal Board shall be final.
A judicial review can be requested by any person aggrieved by a decision or order of the
community, after exhausting his/her administrative remedies. They shall have the right to
appeal de novo to the Mobile County Circuit Court.
Y
SECTION I. SAVINGS CLAUSE
If any section, subsection, sentence, clause, phrase, or word of this ordinance is for any reason held
to be noncompliant with 44 Code of Federal Regulation 59-78, such decision shall not affect the
validity of the remaining portions of this ordinance.
SECTION J. REPEALER
2/7/2019 pg | 6
Page 7
O
FLOOD DAMAGE PREVENTION ORDINANCE
Ordinance 1956 of the City of Prichard, Alabama is hereby repealed. This Repealer shall not,
however, effect, terminate, or preclude any rights, duties, requirements or terms which arose or
existed while said Ordinance was in effect, all of which are specifically preserved.
ARTICLE 3
ADMINISTRATION
SECTION A DESIGNATION OF FLOODPLAIN ADMINISTRATOR
The City of Prichard Building Inspector is hereby appointed to administer and implement the
provisions of this ordinance.
SECTION B PERMIT PROCEDURES
Application for a Development Permit shall be made to the Floodplain Administrator on forms
furnished by the community PRIOR to any development activities, and may include, but not be
limited to, the following: Plans in duplicate drawn to scale showing the elevations of the area in
question and the nature, location, dimensions, of existing or proposed structures, fill placement,
storage of materials or equipment, and drainage facilities.
Specifically, the following procedures and information are required for all projects in the Special
Flood Hazard Areas within the jurisdiction of City of Prichard:
(1) ~— Application Stage
Plot plans are to include:
(a) The Base Flood Elevation (BFE) where provided as set forth in Article 2, Section B;
Article 4, Section C; or Article 5, Section D;
(b) Boundary of the Special Flood Hazard Area and floodway(s) as delineated on the
FIRM or other flood map as determined in Article 2, Section B;
(c) Flood zone designation of the proposed development area as determined on the
FIRM or other flood map as determined in Article 2, Section B;
() Elevation in relation to mean sea level (or highest adjacent grade) of the regulatory
lowest floor level, including basement, of all proposed structures;
(e) Elevation in relation to mean sea level to which any non-residential structure will be
flood proofed;
® Design certification from a registered professional engineer or architect that any
proposed non-residential flood-proofed structure will meet the flood-proofing
criteria of Article 4, Sections B(2) and E(2);
(g) | A Foundation Plan, drawn to scale, that shall include details of the proposed
foundation system to ensure all provisions of this ordinance are met. These details
include, but are not limited to, the proposed method of elevation (i.e., fill, solid
foundation perimeter wall, solid backfilled foundation, open foundation on
columns/posts/piers/piles/shear walls) and description of any flood openings
2/7/2019 . pg [7
Page 8
O
(h)
(i)
6)
9)
FLOOD DAMAGE PREVENTION ORDINANCE
required in accordance with Article 4, Sections B(1), B(3), D(7), and E(1) when
solid foundation perimeter walls are used.
Usage details of any enclosed areas below the lowest floor shall be described.
Plans and/or details for the protection of public utilities and facilities such as sewer,
gas, electrical, and water systems to be located and constructed to minimize flood
damage.
Description of the extent to which any watercourse will be altered or relocated as a
result of a proposed development including current and proposed locations of the
watercourse. An engineering report shall be provided on the effects of the proposed
project on the flood-carrying capacity of the watercourse and the effects to properties
located both upstream and downstream. The affected properties shall be depicted on
a map or on the plot plan.
Certification of the plot plan by a licensed professional engineer or surveyor in the
State of Alabama is required.
(2) —_ Construction Stage
For all new construction and substantial improvements, the permit holder shall provide to
the Floodplain Administrator an as-built certification of the regulatory floor elevation or
flood-proofing level using appropriate FEMA elevation or floodproofing certificate
immediately after the lowest floor or flood proofing is completed.
(a)
(b)
(c)
(@)
()
2/7/2019
When flood proofing is utilized for non-residential structures, said certification shall
be prepared by or under the direct supervision of a professional engineer or architect
and certified by same.
Any work undertaken prior to submission of these certifications shall be at the
permit holder's risk.
The Floodplain Administrator shall review the above referenced certification data
submitted. Deficiencies detected by such review shall be corrected by the permit
holder immediately and prior to further progressive work being allowed to proceed.
Failure to submit certification or failure to make said corrections required hereby,
shall be cause to issue a stop-work order for the project.
The Floodplain Administrator shall make periodic inspections of projects during
construction throughout the Special Flood Hazard Areas within the jurisdiction of
the community to ensure that the work is being done according to the provisions of
the local ordinance and the terms of the permit. Members of his or her
inspections/engineering department shall have a right, upon presentation of proper
credentials, to enter on any premises within the territorial jurisdiction of the
department at any reasonable hour for the purposes of inspection or other
enforcement action.
The Floodplain Administrator may revoke and require the return of the
floodplain development permit by notifying the permit holder in writing stating the
reason(s) for the revocation. Permits shall be revoked for any substantial departure
from the approved application, plans, and specifications; for refusal or failure to
comply with the requirements of State or local laws; or for false statements or
misrepresentations made in securing the permit. Any floodplain development permit
pg] 8
Page 9
3)
FLOOD DAMAGE PREVENTION ORDINANCE
mistakenly issued in violation of an applicable State or local law may also be
revoked.
In any lot or lots/areas that will be or have been removed from the special flood
hazard area utilizing a Letter of Map Revision Based on Fill (LOMR-F), the top of
fill level must meet the community's freeboard elevation at that location. If the top of
fill level is below the freeboard elevation, all new structures, additions to existing
buildings or substantial improvement must meet the required community freeboard
elevation.
(3) Finished Construction
Upon completion of construction, a FEMA elevation certificate FEMA Form 81-31), which
depicts all finished construction elevations, is required to be submitted to the Floodplain
Administrator prior to issuance of a Certificate of Occupancy.
(a)
(b)
(©)
@)
()
SECTION C
If the project includes a floodproofing measure, a FEMA floodproofing certificate is
required to be submitted by the permit holder to the Floodplain Administrator.
The Floodplain Administrator shall review the certificate(s) data submitted.
Deficiencies detected by such review shall be corrected by the permit holder
immediately and prior to Certificate of Compliance/Occupancy issuance.
In some instances, another certification may be required to certify corrected as-built
construction. Failure to submit the certification or failure to make required
corrections shall be cause to withhold the issuance of a Certificate of
Compliance/Occupancy.
Documentation regarding completion and compliance with the requirements stated
in the permit application and with Article 3, Section B(1) of this ordinance shall be
provided to the local Floodplain Administrator at the completion of construction or
records shall be maintained throughout the Construction Stage by inspectors for the
Floodplain Administrator. Failure to provide the required documentation shall be
cause to withhold the issuance of a Certificate of Compliance/Occupancy.
All records that pertain to the administration of this ordinance shall be maintained
and made available for public inspection, recognizing that such information may be
subject to the Privacy Act of 1974, as amended.
DUTIES AND RESPONSIBILITIES OF THE ADMINISTRATOR
Duties of the Floodplain Administrator shall include, but shall not be limited to:
(1) Review all development permits to assure that the permit requirements of this ordinance
have been satisfied; and assure that development sites are reasonably safe from flooding.
(2) Review copies of all necessary permits from governmental agencies from which approval is
required by Federal or State law, including section 404 of the Federal Water Pollution
Control Act Amendments of 1972, 33 U.S.C. 1334. Maintain such permits permanently
with floodplain development permit file.
2/7/2019
pg {9
Page 10
O
O
(3)
(4)
(5)
(6)
(2)
(8)
(9)
(10)
ay
FLOOD DAMAGE PREVENTION ORDINANCE
When Base Flood Elevation data or floodway data have not been provided in accordance
with Article 2, Section B then the Floodplain Administrator shall obtain, review and
reasonably utilize any base flood elevation and floodway data available from a Federal,
State, or other sources in order to administer the provisions of Article 4.
Verify and record the actual elevation in relation to mean sea level (or highest adjacent
grade) of the regulatory floor level, including basement, of all new construction or
substantially improved structures in accordance with Article 3, Section B.
Verify and record the actual elevation, in relation to mean sea level to which any new or
substantially improved structures have been flood-proofed, in accordance with Article 4,
Sections B(2) and E(2).
When flood proofing is utilized for a structure, the Floodplain Administrator shall obtain
certification of design criteria from a registered professional engineer or architect in
accordance with Article 3, Section B(1)(c) and Article 4, Section B(2) or E(2).
Notify adjacent communities and the Alabama Department of Natural Resources prior to
any alteration or relocation of a watercourse and submit evidence of such notification to the
Federal Emergency Management Agency (FEMA), and the Alabama Department of
Economic and Community Affairs/Office of Water Resources/NFIP State Coordinator’s
Office.
For any altered or relocated watercourse, submit engineering data/analysis within six (6)
months to FEMA and State to ensure accuracy of community flood maps through the Letter
of Map Revision process. Assure flood carrying capacity of any altered or relocated
watercourse is maintained.
Where interpretation is needed as to the exact location of boundaries of the Areas of Special
Flood Hazard (for example, where there appears to be a conflict between a mapped
boundary and actual field conditions) the Floodplain Administrator shall make the necessary
interpretation. Any person contesting the location of the boundary shall be given a
reasonable opportunity to appeal the interpretation as provided in this Ordinance.
All records pertaining to the provisions of this ordinance shall be maintained in the office of
the Floodplain Administrator and shall be open for public inspection.
In addition, the Floodplain Administrator and his or her designated staff is hereby
authorized and directed to enforce the provisions of this ordinance. The Administrator is
Jurther authorized to render interpretations of this ordinance, which are consistent with its
spirit and purpose.
(a) ‘Right of Entry
i. Whenever necessary to make an inspection to enforce any of the provisions of
this ordinance, or whenever the Administrator has reasonable cause to believe
that there exists in any building or upon any premises any condition or ordinance
violation which makes such building, structure or premises unsafe, dangerous or
2/7/2019 pg | 10
Page 11
O
ii.
tii.
iv.
FLOOD DAMAGE PREVENTION ORDINANCE
hazardous, the Administrator may enter such building, structure or premises at
all reasonable times to inspect the same or perform any duty imposed upon the
Administrator by this ordinance.
If such building or premises are occupied, the Administrator shall first present
proper credentials and request entry. If such building, structure, or premises are
unoccupied, he shall first make a reasonable effort to locate the owner or other
persons having charge or control of such building or premises.
If entry is refused, the Administrator shall have recourse to every remedy
provided by law to secure entry.
When the Administrator shall have first obtained a proper inspection warrant or
other remedy provided by law to secure entry, no owner or occupant or any other
persons having charge, care or control of any building, structure, or premises
shall fail or neglect, after proper request is made as herein provided, to promptly
permit entry therein by the Administrator for the purpose of inspection and
examination pursuant to this ordinance. .
(b) Stop Work Orders
1
Upon notice from the Administrator, work on any building, structure or premises
that is being performed contrary to the provisions of this ordinance shall
immediately cease.
Such notice shall be in writing and shall be given to the owner of the property, or
to his or her agent, or to the person doing the work, and shail state the
conditions under which work may be resumed.
(c) Revocation of Permits
L
ii.
SECTION A
The Administrator may revoke a permit or approval, issued under the provisions
of this ordinance, in case there has been any false statement or misrepresentation
as to the material fact in the application or plans on which the permit or
approval was based.
The Administrator may revoke a permit upon determination that the construction,
erection, alteration, repair, moving, demolition, installation, or replacement of
the structure for which the permit was issued is in violation of, or not in
conformity with, the provisions of this ordinance.
ARTICLE 4
PROVISIONS FOR FLOOD HAZARD REDUCTION
GENERAL STANDARDS
In ALL Areas of Special Flood Hazard the following provisions are required:
Require copies of all necessary permits from governmental agencies from which approval is
required by Federal or State law, including section 404 of the Federal Water Pollution
Control Act Amendments of 1972, 33 U.S.C. 1334. Maintain such permits be on file.
2/7/2019
pg | 13
Page 12
(2)
(3)
(4)
6)
(6)
7)
(8)
(9)
(10)
(11)
(12)
FLOOD DAMAGE PREVENTION ORDINANCE
New construction and substantial improvements of existing structures shall be anchored to
prevent flotation, collapse and lateral movement of the structure.
New construction and substantial improvements of existing structures shall be constructed
with materials and utility equipment resistant to flood damage.
New construction and substantial improvements of existing structures shall be constructed
by methods and practices that minimize flood damage:
(a) All subdivision proposals shall be consistent with the need to minimize flood
damage;
(b) All subdivision proposals shall have public utilities and facilities such as sewer, gas,
electrical and water systems located and constructed to minimize flood damage;
(c) All subdivision proposals shall have adequate drainage provided to reduce exposure
to flood hazards.
All heating and air conditioning equipment and components, all electrical, ventilation,
plumbing, and other service facilities shall be designed and/or located so as to prevent water
from entering or accumulating within the components during conditions of flooding.
Manufactured homes shall be anchored to prevent flotation, collapse, and lateral movement.
Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties
to ground anchors. This standard shall be in addition to and consistent with applicable State
requirements for resisting wind forces.
New and replacement water supply systems shall be designed to minimize or eliminate
infiltration of flood waters into the system. -
New and replacement sanitary sewage systems shall be designed to minimize or eliminate
infiltration of flood waters into the systems and discharges from the systems into flood
waters.
On-site waste disposal systems shall be located and constructed to avoid impairment to them
or contamination from them during flooding.
Any alteration, repair, reconstruction or improvement to a structure which is not compliant
with the provisions of this ordinance, shall be undertaken only if the non- conformity is not
furthered, extended or replaced.
Proposed new construction and substantial improvements that are partially located in an area
of special flood hazard shall have the entire structure meet the standards for new
construction.
Proposed new construction and substantial improvements that are located in multiple flood
hazard risk zones or in a flood hazard risk zone with multiple base flood elevations shall
have the entire structure meet the standards for the most hazardous flood hazard risk zone
and the highest base flood elevation.
2/7/2019 pg [ 12
Page 13
FLOOD DAMAGE PREVENTION ORDINANCE
SECTION B SPECIFIC STANDARDS
In ALL Areas of Special Flood Hazard designated as Al-30, AE, AH, A (with engineered or
estimated base flood elevation), the following provisions are required:
(1)
(2)
(3)
V
Residential and Non-residential Structures - Where base flood elevation data is available,
new construction and substantial improvement of any structure or manufactured home shall
have the lowest floor, including basement, elevated no lower than one foot above the
base flood elevation. Should solid foundation perimeter walls be used to elevate a
structure, openings sufficient to facilitate the unimpeded movements of flood waters shall be
provided in accordance with standards of Article 4, Section B(3).
Non-Residential Structures - New construction and substantial improvement of any non-
residential structure located in A1-30, AE, or AH zones, may be floodproofed in lieu of
elevation. The structure, together with attendant utility and sanitary facilities, must be
designed to be water tight to one (1) foot above the base flood elevation, with walls
substantially impermeable to the passage of water, and structural components having the
capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A
registered professional engineer or architect shall certify that the design and methods of
construction are in accordance with accepted standards of practice for meeting the
provisions above, and shall provide such certification to the official as set forth above and in
Article 3, Section C(6).
Dry floodproofing is allowed only where flood velocities are less than or equal to five feet
per second. A registered professional engineer or architect shall certify that the standards
of this subsection are satisfied. A Flood Emergency Operation Plan and an Inspection and
Maintenance Plan must be provided by the design professional for the building. Such
certification shall be provided to the Floodplain Administrator.
Enclosures for Elevated Buildings - All new construction and substantial improvements of
existing structures that include ANY fully enclosed area below the base flood elevation,
located below the lowest floor formed by the foundation and other exterior walls shall be
designed so as to be an unfinished or flood resistant enclosure. The enclosure shall be
designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic
entry and exit of flood waters.
(a) Designs for complying with this requirement must either be certified by a
professional engineer or architect or meet the following minimum criteria:
q@ Provide a minimum of two openings having a total net area of not less than
one square inch for every square foot of enclosed area subject to flooding (if
a structure has more than one enclosed area below the base flood elevation,
each shall have openings on exterior walls);
Gi) The bottom of all openings shall be no higher than one foot above grade; and
Gii) | Openings may be equipped with screens, louvers, valves and other coverings
and devices provided they permit the automatic flow of floodwater in both
directions. ~
2/7/2019 pg | 13
Page 14
O
(b)
€)
@
©)
®
FLOOD DAMAGE PREVENTION ORDINANCE
So as not to violate the Lowest
5 1 9 1 1 8 798 220 84 25 96.441978 Floor criteria of this ordinance, the unfinished or
flood resistant enclosure shall only be used for parking of vehicles, limited storage of
maintenance equipment used in connection with the premises, or entry to the
elevated area,
The interior portion of such enclosed area shall not be partitioned or finished into
separate rooms. All interior walls, ceilings and floors below the base flood elevation
shall be unfinished and/or constructed of flood resistant materials.
Mechanical, electrical or plumbing devices shall not be installed below the Base
Flood Elevation. The interior portion of such enclosed area(s) shall be void of
utilities except for essential lighting and power as required.
Property owners shall be required to execute a flood openings/venting affidavit
acknowledging that all openings will be maintained as flood vents, and that the
elimination or alteration of the openings in any way will violate the requirements for
enclosures below the base flood elevation. Periodic inspections will be conducted
by the Floodplain Administrator to ensure compliance.
Property owners shall agree, certify, and declare to the following conditions and
restrictions placed on the affected property as a condition for granting a permit. A
binding agreement, referred to as a Non-conversion Agreement, is required to be
executed and recorded with the Deed. It shall obligate the Owner to the Jollowing
terms and conditions:
(i) That the enclosed area(s) shall remain fully compliant with all parts of the
section Enclosures for Elevated Buildings of this Ordinance unless otherwise
modified to be fully compliant with the applicable sections of the Flood
Damage Prevention Ordinance in effect at the time of conversion.
(ii) A duly appointed representative of the City of Prichard is authorized to enter
the property for the purpose of inspecting the exterior and interior of the
enclosed area to verify compliance with the Agreement and Permit.
(iii) | Thecommunity may take any appropriate legal action to correct any
violation pertaining to the Agreement and the subject Permit. ~
(4) Standards for Manufactured Homes and Recreational Vehicles - Where base flood elevation
data are available:
(a)
(b)
2/7/2019
All manufactured homes placed and substantially improved on:
@ individual lots or parcels,
(ii) in new or substantially improved manufactured home parks or subdivisions,
(iii) in expansions to existing manufactured home parks or subdivisions, or
(iv) ona site in an existing manufactured home park or subdivision where a
manufactured home has incurred substantial
5 1 17 5 2 6 1069 1768 115 32 95.690674 damage as the result of a
flood, must have the lowest floor including basement elevated no lower than
one foot above the base flood elevation.
Manufactured homes placed and substantially improved in an existing manufactured
home park or subdivision may be elevated so that either:
pg | 14
Page 15
O
6)
(6)
FLOOD DAMAGE PREVENTION ORDINANCE
(i) the lowest floor of the manufactured home is elevated no lower than one foot
above the level of the base flood elevation, or
Gi) where no Base Flood Elevation exists, the manufactured home chassis and
supporting equipment is supported by reinforced piers or other foundation
elements of at least equivalent strength and a maximum of 60 inches (five
feet) above grade and must meet the standards of Article 4, Section D(S5).
(c) All Manufactured homes must be securely anchored to an adequately anchored
foundation system to resist flotation, collapse and lateral movement.
(d) — All recreational vehicles placed on sites must either:
a) be on the site for fewer than 180 consecutive days, fully licensed and ready
for highway use if it is licensed, on its wheels or jacking system, attached to
the site only by quick disconnect type utilities and security devices, and has
no permanently attached structures or additions; or
Gi) the recreational vehicle must meet all the requirements for New
4 1 5 5 2 0 458 762 1021 33 -1
5 1 5 5 2 1 458 762 191 30 95.227440 Construction,
including the anchoring and elevation requirements of Article
4, Section B, provisions (3)(a) and (3)(c).
Require, until a regulatory floodway is designated, that no new construction, substantial
improvements, or other development (including fill) shall be permitted within Zones A1-30
and AE on the City of Prichard FIRM, unless it is demonstrated that the cumulative effect of
the proposed development, when combined with all other existing and anticipated
development, will not increase the water surface elevation of the base flood more than one
foot at any point within the community.
Accessory Structures (also referred to as appurtenant structures) — This provision generally
applies to new and substantially improved accessory structures. When an accessory
structure complies with all other provisions of this ordinance (including floodway
encroachment), represents a minimal investment (less than $1,000), and meets the
requirements outlined below, these structures may be wet-floodproofed and do not have to
be elevated or dry floodproofed.
Accessory structures include, but are not limited to, residential structures such as detached
garages, storage sheds for garden tools or woodworking, gazebos, picnic pavilions,
boathouses, small pole barns, and similar buildings. The following provisions apply to
accessory structures built below the base flood elevation:
(a) | A permit shall be required prior to construction or installation.
(b) = Must be low value (less than $1,000) and not be used for human habitation.
(c) | Use must be restricted to parking of personal vehicles or limited storage (low-cost
items that cannot be conveniently stored in the principal structure).
(d) Must be designed with an unfinished interior and constructed with flood damage-
resistant materials below the BFE.
(ec) Must be adequately anchored to prevent flotation, collapse, or lateral movement.
@® Must have adequate flood openings as described in Article 4, Section A (5) and be
designed to otherwise have low flood damage potential.
(g) Shall be constructed and placed on the building site so as to offer the minimum
resistance to the flow of floodwaters.
2/7/2019 pg | 15
Page 16
FLOOD DAMAGE PREVENTION ORDINANCE
(h) — Any mechanical and other utility equipment in the structure must be elevated to or
above the BFE or must be floodproofed.
@ Under limited circumstances communities may issue variances to permit
construction of wet-floodproofed accessory structures. Communities should not
grant variances to entire subdivisions for accessory structures, especially detached
garages. Variances should only be reviewed and issued on an individual or case-by-
case basis and be based on the unique characteristics of the site.
SECTION C FLOODWAYS
Located within Areas of Special Flood Hazard established in Article 2, Section B, are areas
designated as floodway. A floodway may be an extremely hazardous area due to velocity
floodwaters, debris or erosion potential. In addition, the area must remain free of encroachment in
order to allow for the dischargé of the base flood without increased flood heights. Therefore, the
following provisions shall apply:
(1) The community shall select and adopt a regulatory floodway based on the principle that the
area chosen for the regulatory floodway must be designed to carry the waters of the base
flood, without increasing the water surface elevation of that flood more than one foot at any
point;
(2) Encroachments are prohibited, including fill, new construction, substantial improvements or
other development within the adopted regulatory floodway. Development may be permitted
however, provided it is demonstrated through hydrologic and hydraulic analyses performed
in accordance with standard engineering practice that’ the encroachment shall not result in
any increase‘in flood levels or floodway widths during a base flood discharge. A registered
professional engineer must provide supporting technical data and certification thereof;
(3) | Acommunity may permit encroachments within the adopted regulatory floodway that would
result in an increase in base flood elevations, provided that the community first applies for a
conditional letter of map revision (CLOMR) and floodway revision, fulfills the requirements
for such revisions as established under the provisions of § 65.12, and receives the approval
of FEMA;
(4) ONLY if Article 4, Section C, provisions (1) through (3) are satisfied, then any new
construction or substantial improvement shall comply with all other applicable flood hazard
reduction provisions of Article 4.
(2) Encroachments, including fill, new construction, placement of manufactured homes,
substantial improvements, and other development, are prohibited.
Q) As ilong as no fill, structures (including additions), or other impediments to flow are added,
permissible uses within the floodway may include: lawns, gardens, athletic fields, play
areas, picnic grounds, and hiking/biking/horseback riding trails, general farming, pasture,
SECTION D BUILDING STANDARDS FOR STREAMS WITHOUT
ESTABLISHED BASE FLOOD ELEVATIONS (APPROXIMATE A-ZONES)
2/7/2019 pe | 16
Page 17
O
FLOOD DAMAGE PREVENTION ORDINANCE
Located within the Areas of Special Flood Hazard established in Article 2, Section B, where
streams exist but no base flood data have been provided (Approximate A-Zones), the following
provisions apply:
(1) Base flood elevation data shall be provided for subdivision proposals and all other proposed
development, including manufactured home parks and subdivisions, greater than fifty (50)
lots or five (5) acres, whichever is the lesser.
(2) | When base flood elevation data or floodway data have not been provided in accordance with
Article 2, Section B then the Floodplain Administrator shall obtain, review, and reasonably
utilize any scientific or historic Base Flood Elevation and floodway data available from a
Federal, State, or other source, in order to administer the provisions of Article 4. ONLY if
data are not available from these sources, then Article 4, Section D, provisions (5) and (6)
shall apply:
(3) No encroachments, including structures or fill material, shall be located within an area
equal to the width of the stream or twenty-five feet, whichever is greater, measured from the
top of the stream bank, unless certification by a registered professional engineer is provided
demonstrating that such encroachment shall not result in any increase in flood levels during
the occurrence of the base flood discharge.
(4) = All development in Zone A must meet the requirements of Article 4, Section A and Section
B(1) through B(A4).
(5) Inspecial flood hazard areas without base flood elevation data, new construction and
substantial improvements of existing structures shall have the lowest floor (for the lowest
enclosed area; including basement) elevated no less than three (3) feet above the highest
adjacent grade. If the requirement as set forth in Article 4, Section B(1) and (2) require the
lowest floor to be elevated no less than one foot about the base flood elevation, then the
structure for this condition shall be elevated no less than four (4) feet about the highest
adjacent grade.
(6) Inthe absence of a base flood elevation, a manufactured home must also meet the elevation
requirements of Article 4, Section B(4)(b)(ii) in that the structure must be elevated to a
maximum of 60 inches (5 feet).
(7) Openings sufficient to facilitate automatic equalization of flood water hydrostatic forces on
exterior walls shall be provided in accordance with standards of Article 4, Section B(3)(a).
The Floodplain Administrator shall certify the lowest floor elevation level and the record
shall become a permanent part of the permit file.
(8) ‘Fill within the area of special flood hazard shall result in no net loss of natural floodplain
storage. The volume of loss of floodwater storage due to filling in the special flood hazard area
shall be offset by providing an equal volume of flood storage by excavation or other
(9)
2/7/2019 pa | 17
Page 18
FLOOD DAMAGE PREVENTION ORDINANCE
© SECTION E STANDARDS FOR AREAS OF SHALLOW FLOODING (AO ZONES)
Areas of Special Flood Hazard established in Article 2, Section B may include designated AO
shallow flooding areas. These areas have base flood depths of one to three feet (1'-3') above
ground, with no clearly defined channel. The following provisions apply:
(i) ~~ All new construction and substantial improvements of residential and nonresidential
structures shall have the lowest floor, including basement, elevated above the highest
adjacent grade at least as high as the depth number specified on the Flood Insurance Rate
Map (FIRM) plus one foot of freeboard. If no depth number is specified, the lowest
floor, including basement, shall be elevated at least three (3) feet above the highest
adjacent grade. Openings sufficient to facilitate the unimpeded movements of flood waters
shall be provided in accordance with standards of Article 4, Section B (3), “Enclosures for
Elevated Buildings”.
The Floodplain Administrator shall certify the lowest floor elevation level and the record
shall become a permanent part of the permit file.
(2) Newconstruction and the substantial improvement of a non-residential structure may be
flood-proofed in lieu of elevation. The structure, together with attendant utility and
sanitary facilities, must be designed to be water tight to the specified flood level in
Article 4, Section E(1) or three (3) feet (if no depth number is specified), above highest
O adjacent grade, with walls substantially impermeable to the passage of water, and
structural components having the capability of resisting hydrostatic and hydrodynamic loads
and the effect of buoyancy. A registered professional engineer or architect shall certify that
the design and methods of construction are in accordance with accepted standards of
practice for meeting the provisions above, and shall provide such certification. to the official
as set forth above and as required in Article 3, Section B(1)(c) and (2).
(3) Drainage paths shall be provided to guide floodwater around and away from any proposed
structure.
SECTION F STANDARDS FOR SUBDIVISIONS
() All subdivision proposals shall be consistent with the need to minimize flood damage.
(2) All subdivision proposals shall have public utilities and facilities such as sewer, gas,
electrical and water systems located and constructed to minimize flood damage.
(3) All subdivision proposals shall have adequate drainage provided to reduce exposure to
’ flood hazards, and;
(4) Base flood elevation data shall be provided for all new subdivision proposals and other
proposed development (including manufactured home parks and subdivisions), which is
O greater than fifty lots or five acres; whichever is the lesser.
2/7/2019 pg | 18
Page 19
FLOOD DAMAGE PREVENTION ORDINANCE
© (3) All subdivision and other development proposals which involve disturbing more than {area
designated by community} square feet of land shall include a stormwater management plan
which is designed to limit peak runoff from the site to predevelopment levels for the one, ten,
and 100-year rainfall event. These plans shall be designed to limit adverse impacts to
downstream channels and floodplains. Single residential lots involving less than one acre
of land disturbance are not subject to this regulation.
(6) _ All preliminary plans for platted subdivisions shall identify the flood hazard area and the
elevation of the base flood.
(7) Ail final subdivision plats will provide the boundary of the special flood hazard area, the
floodway boundary, and the base flood elevations.
(8) — Inplatted subdivisions, all proposed lots or parcels that will be future building sites shall
have a minimum buildable area outside the natural (non-filled) 1% chance annual
floodplain. The buildable area shall be, at a minimum, large enough to accommodate any
primary structure and associated structures such as sheds, barns, swimming pools, detached
garages, on-site sewage disposal systems, and water supply wells, where applicable.
SECTION G. CRITICAL FACILITIES
Construction of new and substantially improved critical facilities shall be located outside the limits
O of the special flood hazard area (one percent annual chance floodplain). Construction of new
critical facilities shall be permissible within the SFHA only if no feasible alternative site is
available and access to the facilities remains available during a 0.2 percent chance flood.
(1) Critical facilities constructed within the SFHA shall have the lowest floor elevated three feet
above the base flood elevation at the site (or to the 0.2 percent chance flood elevation
whichever is greater).
(2) Floodproofing and sealing measures must be implemented to ensure that any and all on-site
toxic substances will not be displaced by or released into floodwaters.
(3) —_ Multiple access routes, elevated to or above the 0.2 percent flood elevation, shall be
provided to all critical facilities to the maximum extent possible.
(4) Critical facilities must be protected to or above the 0.2 percent chance flood and must
remain operable during such an event.
a. The community’s flood response plan must list facilities considered critical in a
1 flood.
b. Other facilities in low risk flood zones that may also be needed to support flood
response efforts must be included on the critical facility list.
(5) The use of any structure shall not be changed to a critical facility, where such a change in
O use will render the new critical facility out of conformance with this section.
2/7/2019 pg | 19
Page 20
FLOOD DAMAGE PREVENTION ORDINANCE
ARTICLE 5
VARIANCE PROCEDURES
Article revised 2/15/2018
SECTION A. DESIGNATION OF VARIANCE AND APPEALS BOARD
The Board of Adjustment as established by the City Council of City of Prichard shall hear and
decide requests for appeals or variance from the requirements of this ordinance.
SECTION B. DUTIES OF BOARD
The Board shall hear and decide appeals when it is alleged an error in any requirement, decision, or
determination is made by the Floodplain Administrator in the enforcement or administration of this
ordinance. Any person aggrieved by the decision of the Board of Adjustment may appeal such
decision to the Circuit Court of Mobile County, as provided in Code of Alabama 1975.
SECTION C. VARIANCE PROCEDURES
In reviewing requests for variance, the Board of Adjustment shall consider all technical evaluations,
relevant factors, and standards specified in other sections of this ordinance, and:
(1) Variances may be issued for development necessary for the conduct of a functionally
dependent use, provided the criteria of this Article are met, no reasonable alternative exists,
the development is protected by methods that minimize flood damage during the base flood,
and it creates no additional threats to public safety.
(2) Variances shall not be issued within any designated floodway if ANY increase in flood
levels during the base flood discharge would result.
(3) The evaluation must be based on the characteristics unique to that property and not be
shared by adjacent parcels. The characteristics must pertain to the land itself, not to the
structure, its inhabitants, or its owners.
(4) Variances should never be granted for multiple lots, phases of subdivisions, or entire
subdivisions,
(5) The danger of life and property due to flooding or erosion damage including materials that
may be swept onto other lands to the injury of others.
(6) The susceptibility of the proposed facility and its contents to flood damage and the effect of
such damage on the individual owner and the community.
2/7/2019 pg [ 20
Page 21
FLOOD DAMAGE PREVENTION ORDINANCE
CO (7) The safety of access to the property during flood conditions for daily traffic and emergency
vehicles.
(8) The importance of the services provided by the proposed facility to the community.
(9) The necessity of the facility to be at a waterfront location, where applicable.
(10) The compatibility of the proposed use with existing and anticipated development based on
the community’s comprehensive plan for that area.
(11) The expected heights, velocity, duration, rate of rise, and sediment transport of the
floodwaters and the effects of wave action, if applicable, expected at the site.
(12) The costs associated with providing governmental services to the development during and
after flood conditions, including maintenance and repair of public utilities and facilities such
as sewer, gas, electrical, and water systems, and community infrastructure such as streets,
bridges, and culverts.
Upon consideration of factors listed above, and the purpose of this ordinance, the Board of
Adjustment may attach such conditions to the granting of variances as it deems necessary to further
the purposes of this ordinance.
© SECTION D. VARIANCES FOR HISTORIC STRUCTURES
Variances may be issued for the repair or rehabilitation of Historic Structures upon a determination
that the proposed repair or rehabilitation will not preclude the structure's continued designation as a
Historic Structure and the variance is the minimum to preserve the historic character and design of
the structure.
SECTION E. CONDITIONS FOR VARIANCES
The provisions of this Ordinance are minimum standards for flood loss reduction, therefore any
deviation from the standards must be weighed carefully. Variances shall only be issued upon a
determination that the variance is the minimum necessary, considering the flood hazard, to afford
relief.
(1) A variance may be issued for new construction and substantial improvements to be erected
on a lot of one-half acre or less in size, contiguous to and surrounded by lots with existing
structures constructed below; the base flood level, in conformance with the procedures of
Sections E(3), E(4), F(1) and F(2) of this Article.
(2) In the instance of a Historic Structure, a determination is required that the variance is the
minimum necessary so as not to destroy the historic character and design of the building.
QO (3) A variance shall be issued ONLY when there is:
(a) A finding of good and sufficient cause;
2/7/2019 pg | 22
Page 22
FLOOD DAMAGE PREVENTION ORDINANCE
(b) A determination that failure to grant the variance would result in exceptional
hardship; and
(c) A determination that the granting of a variance will not result in increased flood
heights, additional threats to public safety, extraordinary public expense, create
nuisance, cause fraud on or victimization of the public, or conflict with existing local
laws or ordinances. |
(4) _ A variance shall only be issued upon a determination that the variance is the minimum
necessary, considering the flood hazard, to afford relief.
(5) Variances shall not be issued “after the fact.”
SECTION F. VARIANCE NOTIFICATION AND RECORDS
(1) Any applicant to whom a variance is granted shall be given written notice over the signature
of a community official that specifies the difference between the base flood elevation and the
-elevation of the proposed lowest floor and stating that the issuance of such a variance could:
a, result in rate increases in the hundreds and possibly thousands of dollars annually
depending on structure and site-specific conditions; and
b. increase the risk to life and property resulting from construction below the base flood
level.
(2) The Floodplain Administrator shall maintain a record of all variance actions and appeal
actions, including justification for their issuance. Report any variances to the Federal
Emergency Management Agency Region 4 and the Alabama Department of Economic and
Community Affairs/Office of Water Resources upon request.
(3) | Acopy of the notice shall be recorded by the Floodplain Administrator in the Office of the
City Clerk or Flood Plain Administrator City of Prichard and shall be recorded in a manner
so that it appears in the chain of title of the affected parcel of land.
ARTICLE 6
DEFINITIONS
Unless specifically defined below, words or phrases used in this ordinance shall be interpreted so as
to give them the meaning they have in common usage and to give this ordinance its most reasonable
application.
A Zone means the Area of Special Flood Hazard without base flood elevations determined.
Accessory Structure (also referred to as appurtenant structures) means a structure which is
located on the same parcel of property as a principal structure to be insured and the use of which is
2/7/2019 pg | 22
Page 23
FLOOD DAMAGE PREVENTION ORDINANCE
incidental to the use of the principal structure. They should constitute a minimal initial investment,
may not be used for human habitation, and be designed to have minimal flood damage potential.
These structures are used solely for parking (two-car detached garages or smaller) or limited. storage
(small, low cost storage sheds). They are included under the general definition of structure and are
consequently subject to all floodplain management regulations pertaining to structures.
Addition (to an existing building) means any improvement that increases the square footage of a
structure. These include lateral additions added to the front, side, or rear of a structure, vertical
additions added on top of a structure, and enclosures added underneath a structure. NFIP
regulations for new construction apply to any addition that is considered a perimeter expansion or
enclosure beneath a structure. If it is considered to be a substantial improvement (more than 50%
of market value) to a structure, the existing structure will also need to be treated as new
construction.
Depending on the flood zone and details of the project, the existing building may not have to be
elevated. The determining factors are the common wall and what improvements are made to the
existing structure. If the common wall is demolished as part of the project, then the entire structure
must be elevated. If only a doorway is knocked through it and only minimal finishing is done, then
only the addition has to be elevated.
AE Zone means the Area of Special Flood Hazard with base flood elevations determined.
AH Zone means an area of one Fervent chance of shallow flooding where depths are between one
to three feet (usually shallgw ponding), with base flood elevations shown.
AO Zone means an area of one percent chance of shallow flooding where depths are between one
to three feet (usually sheet flow on sloping terrain), with depth numbers shown.
‘Appeal means a request for a review of the Board of Adjustment interpretation of any provision of
this ordinance.
AR/AE, AR/AH, AR/AO, and AR/A Zones means a flood zone that results from the decertification
of a previously accredited flood protection system or levee that is in the process of being restored to
provide a one percent chance or greater level of flood protection. Afier restoration is complete,
these areas will still experience residual flooding from other flooding sources.
A99 Zone means that part of the special flood hazard area inundated by the one percent annual
chance flood to be protected from the one percent chance flood by a Federal flood protection
system or levee under construction, no base flood elevations are determined.
Area of shallow flooding means a designated AO or AH Zone on a community's Flood Insurance
Rate Map (FIRM) with base flood depths from one to three feet, and/or where a clearly defined
channel does not exist, where the path of flooding is unpredictable and indeterminate, and where
velocity flow may be evident.
2/7/2019 . pg | 23
Page 24
FLOOD DAMAGE PREVENTION ORDINANCE
Area of special flood hazard (also see “Special flood hazard area”) means the land in the
floodplain within a community subject to a one percent or greater chance of flooding in any given
year. In the absence of official designation by the Federal Emergency Management Agency, Areas
of Special Flood Hazard shall be those designated by the local community and referenced in Article
2, Section B.
Base fiood means the flood having a one percent chance of being equaled or exceeded in any given
year (also referred to as the “one percent chance flood”).
Base flood elevation means the computed elevation to which floodwater is anticipated to rise
during the base flood. It is also the elevation of surface water resulting from a flood that has a 1%
chance of equaling or exceeding that level in any given year. Base Flood Elevations are shown in
the FIS and on the Flood Insurance Rate Map (FIRM) for zones AE, AH, A1—A30, AR, AR/A,
AR/AE, AR/Ai— A30, AR/AH, AR/AO, V1—V30 and VE.
Basement means any portion of a building having its floor sub grade (below ground level) on all
sides.
Building (also see Structure) means (1) A structure with 2 or more outside rigid walls and a fully
secured roof, that is affixed to a permanent site; or (2) a manufactured home (a “manufactured
home,” also known as a mobile home, is a structure built on a permanent chassis, transported to its
site in 1 or more sections, and affixed to a permanent foundation); or (3) a travel trailer without
wheels, built on a chassis and affixed to a permanent foundation, that is regulated under the
community’s floodplain management and building ordinances or laws.
Community means a political entity and/or its authorized agents or representatives that have the
authority to adopt and enforce floodplain ordinances for the area under its jurisdiction. |
Community Rating System (CRS) means a program developed by the Federal Insurance
Administration to provide incentives for those communities in the Regular Program that have gone
beyond the minimum floodplain management requirements to develop extra measures to provide
protection from flooding.
Critical facility (aka, critical action) means facilities for which the effects of even a slight chance of
flooding would be too great. The minimum floodplain of concern for critical facilities is the 0.2
percent chance flood level. Critical facilities include, but are not limited to facilities critical to the
health and safety of the public such as: emergency operations centers, designated public shelters,
schools, nursing homes, hospitals, police, fire and emergency response installations, vital data
storage centers, power generation and water and other utilities (including related infrastructure
such as principal points of utility systems) and installations which produce, use or store hazardous
materials or hazardous waste (as defined under the Clean Water Act and other Federal statutes and
regulations).
D Zone means an area in which the flood hazard is undetermined.
2/7/2019 pg | 24
Page 25
FLOOD DAMAGE PREVENTION ORDINANCE
Dam means any artificial barrier, including appurtenant works, constructed to impound or divert
water, waste water, liquid borne materials, or solids that may flow if saturated. All structures
necessary to maintain the water level in an impoundment or to divert a stream from its course will
be considered a dam.
Development means any man-made change to improved or unimproved real estate, including, but
not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation,
drilling operations, or storage of equipment or materials.
Dry Floodproofing means any combination of structural and nonstructural additions, changes, or
adjustments to structures, which reduce or eliminate flood damages to real estate or improved real
estate property, water, and sanitary facilities, structures, and their contents. Structures shall be
floodproofed with a minimum of 12 inches above the base flood elevation (more is recommended).
Dry floodproofing of a pre-FIRM residential structure that has not been substantially damaged or
improved is allowed. Dry floodproofing of a post-FIRM residential building is not allowed. Non-
residential structures may be dry floodproofed in all flood zones with the exception of the Coastal
High Hazard Area or the Coastal AE Zone.
Elevated building means a non-basement building which has its lowest elevated floor raised above
ground level by foundation walls, pilings, posts, columns, piers, or shear walls.
Elevation Certificate means a FEMA form used as a certified statement that verifies a building’s
elevation information.
Encroachment means the advance or infringement of uses, plant growth, fill, excavation, buildings,
structures or development into a floodplain, which may impede or alter the flow capacity of a
floodplain.
Existing Construction means any structure for which the start
5 1 10 1 1 10 1013 1304 31 25 96.970459 of
5 1 10 1 1 11 1049 1304 176 26 90.258049 construction commenced before
{date of community’s initial floodplain management ordinance adoption date} February 4, 1981 or
before January 1, 1975, for FIRMs effective before that date. Existing construction may also be
referred to as existing structures.
Existing manufactured home park or subdivision means a manufactured home park or
subdivision for which the construction of facilities for servicing the lots on which the manufactured
homes are to be affixed (including at a minimum the installation of utilities, the construction of
streets, and final site grading or the pouring of concrete pads) is completed before {date of
community’s initial floodplain management ordinance adoption date}.
Expansion to an existing manufactured home park or subdivision means the preparation of
additional sites by the construction of facilities for servicing the lots on which the manufactured
homes are to be affixed, including the installation of utilities, the construction of streets, and either
final site grading or the pouring of concrete pads.
Flood or flooding means a general and temporary condition of partial or complete inundation of
normally dry land areas from:
~
2/7/2019 pg | 25
Page 26
FLOOD DAMAGE PREVENTION ORDINANCE
The overflow of inland or tidal waters; or
The unusual and rapid accumulation or runoff of surface waters from any source.
Mudslides which are proximately caused by flooding as described in part “b.” of this
definition and are akin to a river of liquid and flowing mud on the surfaces of
normally dry land areas, as when earth is carried by a current of water and deposited
along the path of the current.
d. The collapse or subsidence of land along the shore of a lake or other body of water as
a result of erosion or undermining caused by waves or currents of water exceeding
anticipated cyclical levels or suddenly caused by an unusually highwater level in a
natural body of water, accompanied by a severe storm, or by an unanticipated force
of nature, such as flash flood or an abnormal tidal surge, or by some similarly
unusual and unforeseeable event which results in flooding as defined in part “a.” of
this definition.
Flood Hazard Boundary Map (FHBM) means an official map of a community, issued by the
Federal Insurance Administration, where the boundaries of areas of special flood hazard have been
designated as Zone A.
peop
Flood Insurance Rate Map (FIRM) means an official map of a community, on which the Federal
Emergency Management Agency has delineated the areas of special flood hazard and/or risk
premium zones applicable to the community.
Flood Insurance Study/ Flood Elevation Study means an examination, evaluation and
determination of flood hazards and, if appropriate, corresponding water surface elevations, or an
examination, evaluation and determination of mudslide and/or flood-related erosion hazards.
loodplain means any land area susceptible to being inundated by water from any source.
Floodplain management means the operation of an overall program of corrective and preventive
measures for reducing flood damage and preserving and enhancing, where possible, natural
resources in the floodplain, including but not limited to emergency preparedness plans, flood
control works, floodplain management regulations, and open space plans.
Floodplain management regulations means this ordinance and other zoning ordinances, S
subdivision regulations, building codes, health regulations, special purpose ordinances, and other
applications of police power which control development in flood-prone areas. This term describes
federal, state, or local regulations in any combination thereof, which provide standards for
preventing and reducing flood loss and damage.
Floodprocfing means any combination of structural and nonstructural additions, changes or
adjustments to structures, which reduce or eliminate risk of flood damage to real estate or improved
real property, water and sanitation facilities or structures with their contents.
Floodway (Regulatory Fleodway) means the channel of a river or other watercourse and the
adjacent land areas that must be reserved in order to discharge the base flood without cumulatively
increasing the water surface elevation more than a designated height.
2/7/2019 pg | 26
Page 27
O
FLOOD DAMAGE PREVENTION ORDINANCE
Floodway fringe means that area of the special flood hazard area on either side of the regulatory
floodway.
XX
Flood Protection Elevation means the base flood elevation plus the community freeboard. In areas
where no base flood elevations exist from any authoritative source, the flood protection elevation
can be historical flood elevations or base flood elevations determined and/or approved by the
floodplain administrator plus freeboard.
Freeboard means a factor of safety usually expressed in feet above the Base Flood Elevation
(BFE) for purposes of floodplain management which tends to compensate for the many
unknown factors that could contribute to flood heights greater than the height calculated fora _
selected size flood and floodway conditions, such as wave action, bridge openings, and the
hydrological effect of urbanization of the watershed. Used to determine the level for a
building's lowest floor elevation or level of floodproofing required to be in compliance with the
community's floodplain management regulations.
Functionally dependent facility means a facility which cannot be used for its intended purpose
unless it is located or carried out in close proximity to water. The term includes only docking
facilities, port facility that are necessary for the loading and unloading of cargo or passengers, and
shipbuilding, and ship repair facilities. The term does not include long-term storage or related
manufacturing facilities.
Hardship (as related to variances of this ordinance) means the exceptional difficulty that would
result from a failure to grant the requested variance. The Board of Adjustment requires that the
variance is exceptional, unusual, and peculiar to the property involved. Mere economic or financial
hardship alone is NOT exceptional. Inconvenience, aesthetic considerations, physical handicaps,
personal preferences, or the disapproval of one’s neighbors likewise cannot, as a rule, qualify as an
exceptional hardship. All of these problems can be resolved through other means without granting
a variance, even if the alternative is more expensive, or requires the property owner to build
elsewhere or put the parcel to a different use than originally intended.
Highest adjacent grade means the highest natural elevation of the ground surface, prior to
construction, next to the proposed walls of a structure.
Historic Structure means any structure that is;
a. Listed individually in the National Register of Historic Places (a listing maintained
by the U.S. Department of Interior) or preliminarily determined by the Secretary of
the Interior as meeting the requirements for individual listing on the National
Register:
b. Certified or preliminarily determined by the Secretary of the Interior as contributing
to the historical significance of a registered historic district or a district preliminarily
determined by the Secretary to qualify as a registered historic district:
c. Individually listed on a state inventory of historic places and determined as eligible
by states with historic preservation programs which have been approved by the
Secretary of the Interior; or
2/7/2019 pg | 27
Page 28
FLOOD DAMAGE PREVENTION ORDINANCE -
d. Individually listed on.a local inventory of historic places and determined as eligible
by communities with historic preservation programs that have been certified either:
i. By an approved state program as determined by the Secretary of the Interior,
or
ii, Directly by the Secretary of the Interior in states without approved programs.
Letter of Map Change (LOMO) is an official FEMA determination, by letter, to amend or revise
effective Flood Insurance Rate Maps, Flood Boundary and Floodway Maps, and Flood Insurance
Studies. LOMC’s are broken down into the following categories:
Letter of Map Amendment (LOMA)
An amendment based on technical data showing that a property was incorrectly included in
a designated SFHA, was not elevated by fill (only by a natural grade elevation), and will not
be inundated by the one percent chance flood. A LOMA amends the current effective FIRM
and establishes that a specific property is not located in a SFHA.
Letter of Map Revision (LOMR)
A revision based on technical data that, usually due to manmade changes, shows changes to
flood zones, flood elevations, floodplain and floodway delineations, and planimetric
features, One common type of LOMR, a LOMR-F, is a determination concerning whether a
structure or parcel has been elevated by fill above the BFE and is, therefore, excluded from
the SFHA.
Conditional Letter of Map Revision (CLOMR)
4 formal review and comment by FEMA as to whether a proposed project complies with the
minimum NFIP floodplain management criteria. A CLOMR does not revise effective Flood
Insurance Rate Maps, Flood Boundary and Floodway Maps, or Flood Insurance Studies.
Levee means a man-made structure, usually an earthen embankment, designed and constructed in
accordance with sound engineering practices to contain, control, or divert the flow of water so as to
provide protection from temporary flooding. [only required in communities with levees]
Levee System means a flood protection system which consists of a levee, or levees, and associated
structures, such as closure and drainage devices, which are constructed and operated in accordance
with sound engineering practices. [only required in communities with levees]
Lowest adjacent grade means the point of the ground leyel immediately next to a building. This
may be the sidewalk, patio, deck support, or basement entryway immediately next to the structure
after the completion of construction. It does not include earth that is placed for aesthetic or
landscape reasons around a foundation wall. It does include natural ground or ‘properly
compacted fill that comprises a component of a building’s foundation system.
Lowest floor means the lowest floor of the lowest enclosed area (including basement). An
unfinished or flood resistant enclosure, used solely for parking of vehicles, building access, or
storage, in an area other than a basement, is not considered a building's lowest floor, provided that
such enclosure is not built so as to render the structure in violation of other provisions of this
ordinance. .
2/7/2019 pg | 28
Page 29
FLOOD DAMAGE PREVENTION ORDINANCE
Manufactured home means a building, transportable in one or more section, built on a permanent
chassis and designed to be used with or without a permanent foundation when connected to the
required utilities. The term also includes park trailers, travel trailers, and similar transportable
structures placed on a site for 180 consecutive days or longer and intended to be improved property.
Manufactured home park or subdivision means a parcel (or contiguous parcels) of land divided
into two or more manufactured home lots for rent or sale.
Market value means-the property value (as agreed between a willing buyer and seller), excluding
the value of land as established by what the local real estate market will bear. Market value can be
established by independent certified appraisal; replacement cost depreciated by age of building |
(Actual Cash Value); or adjusted assessed values.
Mean Sea Level means the average height of the sea for all stages of the tide. It is used asa
reference for the base flood elevations shown on a community’s Flood Insurance Rate Map (FIRM).
For purposes of this ordinance, the term is synonymous with National Geodetic Vertical Datum
(NGVD) of 1929, North American Vertical Datum (NAVD) of 1988, or other datum.
u
National Flood Insurance Program (NFIP) means the federal program that makes flood insurance
available to owners of property in participating communities nationwide through the cooperative
efforts of the Federal Government and the private insurance industry.
National Geodetic Vertical Datum (NGVD) means as corrected in 1929 is a vertical control used
as a reference for establishing varying elevations within the floodplain.
New construction means ANY structure (see definition) for which the start
5 1 11 1 1 12 1188 1265 31 25 95.994888 of
5 1 11 1 1 13 1224 1266 176 25 95.994888 construction
* commenced after {date of community’s initial floodplain management ordinance adoption date}
and includes any subsequent improvements (including additions) to such structures.
New manufactured home park or subdivision means a manufactured home park or subdivision
for which the construction of facilities for servicing the lots on which the manufactured homes are
to be affixed (including at a minimum, the installation of utilities, the construction of streets, and
either final site grading or the pouring of concrete pads) is completed on or after February 4, 1981.
Non-Residential means, but is not limited to; small business concerns, churches, schools, farm
buildings (including grain bins and silos), pool houses, clubhouses, recreational buildings,
mercantile structures, agricultural and industrial structures, warehouses, and hotels and motels with
normal room rentals for less than 6 months duration.
North American Vertical Datum (NAVD) of 1988 means a vertical control, corrected in 1988,
used as a reference for establishing varying elevations within the floodplain.
Obstruction means, but is not limited to, any dam, wall, wharf, embankment, levee, dike, pile,
abutment, protection, excavation, channel construction, bridge, culvert, building, wire, fence, rock,
gravel, refuse, fill, structure, vegetation or other material in, along, across or projecting into any
2/7/2019 pg | 29
Page 30
FLOOD DAMAGE PREVENTION ORDINANCE
watercourse which may alter, impede, retard or change the direction and/or velocity of the flow of
water, or due to its location, its propensity to snare or collect debris carried by the flow of water, or
its likelihood of being carried downstream.
One Percent Flood (aka 100-Year Flood) is the flood that has a one percent chance of being
equaled or exceeded in any given year. Any flood zone that begins with the letter A or V is subject.to
inundation by the one percent chance flood. Over the life of a 30-year loan, there is a 26-percent
chance of experiencing such a flood within the SFHA.
Participating Community is any community that voluntarily elects to participate in the NFIP by
adopting and enforcing floodplain management regulations that are consistent with the standards
of the NFIP.
Post-FIRM Construction means new construction and substantial improvements for which start of
construction occurred after December 31, 1974, or on or after the effective date of the initial FIRM
of the community, whichever is later.
Pre-FIRM Construction means new construction and substantial improvements for which start of
construction occurred on or before December 31, 1974, or before the effective date of the initial
FIRM of the community, whichever is later.
Probation means an action taken by FEMA to formally notify participating communities of the first
of the two NFIP sanctions due to their failure to correct violations and deficiencies in the
administration and enforcement of the local floodplain management regulations.
Public safety and nuisance means anything which is injurious to the safety or health of an entire
community or neighborhood, or any considerable number of persons, or unlawfully obstructs the
free passage or use, in the customary manner, of any navigable lake, or river, bay, stream, canal, or
basin.
Recreational vehicle means a vehicle which is:
Licensed and titled as a recreational vehicle or park model;
Built on a single chassis;
400 square feet or less when measured at the largest horizontal projection;
Has no attached deck, porch, or shed;
Has quick-disconnect sewage, water, and electrical connectors;
Designed to be self-propelled or permanently towable by a light duty truck; and
Designed primarily not for use as a permanent dwelling but as temporary living
quarters for recreational, camping, travel, or seasonal use.
Trap as rp
Regular Program means the second phase of the community’s participation in the NFIP in which
second layer coverage is available based upon risk premium rates only after FEMA has completed
a flood risk study for the community.
Regulatory floodway see Floodway.
2/7/2019 pg | 30
Page 31
FLOOD DAMAGE PREVENTION ORDINANCE
Remedy a violation means to bring the structure or other development into compliance with State
or local floodplain management regulations, or, if this is not possible, to reduce the impacts of its
noncompliance. Ways that impacts may be reduced include protecting the structure or other
affected development from flood damages, implementing the enforcement provisions of the
ordinance or otherwise deterring future similar violations, or reducing Federal financial exposure
with regard to the structure or other development. \
Repetitive Loss means flood-related damages sustained by a structure on two separate occasions
during a 10-year period for which the cost of repairs at the time of each such flood event, on the
average, equals or exceeds 25 percent of the market value of the structure before the damages
occurred.
\
Repetitive Loss Property means any insurable structure for which two or more claims of more than
$1,000 were paid by the National Flood Insurance Program (NFIP) within any rolling 10-year
period, since 1978, At least two of the claims must be more than ten (10) days apart but, within ten
years of each other. A repetitive loss property may or may not be currently insured by the NFIP.
Section 1316 means no new flood insurance policy or federal disaster assistance shall be provided
for any property which the Administrator finds has been declared by a duly constituted State or
local zoning authority or other authorized public body, to be in violation of State or local laws,
regulations or ordinances which are intended to discourage or otherwise restrict land development
or occupancy in floodprone areas. If the structure is made compliant with the applicable
community’s floodplain management ordinance, then the Section 1316 declaration can be rescinded
by the community and flood insurance and disaster assistance eligibility restored.
Severe Repetitive Loss Structure means any insured property that has met at least one of the
Sollowing paid flood loss criteria since 1978, regardless of ownership:
a. Four or more separate claim payments of more than $5,000 each (including building
and contents payments); or
b. Two or more separate claim payments (building payments only) where the total of
the payments exceeds the current market value of the property.
In either case, two of the claim payments must have occurred within ten years of each other.
Multiple losses at the same location within ten days of each other are counted as one loss, with the
payment amounts added together.
Special flood hazard area (SFHA) means that portion of the floodplain subject to inundation by
the base flood and/or flood-related erosion hazards as shown on a FHBM or FIRM as Zones A, AE,
AH, AO, AR, AR/AE, AR/AO, AR/AH, AR/A, A99, or VE.
Start of construction (for other than new construction or substantial improvements under the
Coastal Barrier Resources Act (Pub. L. 97-348)) means the date the development or building permit
was issued (includes substantial improvement), provided the actual start of construction, repair,
reconstruction, or improvement was within 180 days of the permit date. The actual start means the
first placement of permanent construction of the structure (including a manufactured home) on a
2/7/2019 pg} 31
Page 32
FLOOD DAMAGE PREVENTION ORDINANCE
‘ site, such as the pouring of slabs or footings, installation of piles, construction of columns, or any
work beyond the stage of excavation, and includes the placement of a manufactured home on a
foundation.
“Permanent construction” does not include initial land preparation, such as clearing, grading and
filling; nor does it include the installation of streets and/or walkways; nor does it include excavation
for a basement, footings, piers or foundations or the erection of temporary forms; nor does it
include the installation on the property of buildings appurtenant to the permitted structure, such as
garages or sheds not occupied as dwelling units or part of the main structure. (VOTE: accessory
structures are NOT exempt from any ordinance requirements). For a substantial improvement, the
actual start of construction means the first alteration of any wall, ceiling, floor, or other structural
part of a building, whether or not that alteration affects the external dimensions of the building.
Structure means a walled and roofed building, including a liquid or gas storage tank, that is
principally above ground, as well as a manufactured home.
Substantial damage means damage of any origin sustained by a structure whereby the cost of
restoring the structure to it before damaged condition would equal or exceed 50 percent of the
market value of the structure before the damage occurred. Substantial damage also means flood
related damages sustained by a structure on two separate occasions during a 10-year period for
which the cost of repairs at the time of each such flood event, on the average, equals or exceeds 25
percent of the market value of the structure before the damages occurred.
[OR replace the “50 percent” and “25 percent” with lower values for stricter standards]
Substantial improvement means any reconstruction, rehabilitation, addition, or other improvement
ofa structure, the cost of which equals or exceeds 50 percent of the market value of the structure
before the “start of construction” of the improvement. This term includes structures which have
incurred “repetitive loss” or “substantial damage”, regardless of the actual repair work performed.
The market value of the building should be (1) the appraised value of the structure prior to the start
of the initial repair or improvement, or (2) in the case of damage, the value of the structure prior to
the damage occurring.
If lower values are used in the above definition for “Substantial damage”, then include the
same lower values for stricter standards for this defintion]
[OR replace “means any reconstruction, rehabilitation, addition, or other improvement of a
structure, the cost of which equals or exceeds 50 percent of the market value of the structure
before the “start of construction” of the improvement” with the following:]
means any combination of reconstruction, alteration, or improvement to a building, taking place
during a 5-year [or 10-year] period, in which the cumulative percentage of improvement equals or
exceeds 50 percent of the current market value of the structure before the “start of construction” of
the initial improvement. Any subsequent improvement project costs shall be added to the initial
costs for the initial improvement project. At the end of a 5-year [or 10-year] period from the initial
improvement project, an updated valuation for the structure can be used for the next time period.
For the purposes of this definition, substantial
5 1 12 1 1 8 784 1920 189 32 96.269081 improvement is considered to occur when the first
alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or
2/7/2019 pg | 32
Page 33
FLOOD DAMAGE PREVENTION ORDINANCE
not that alteration affects the external dimensions of the building. The term does not, however,
include either:
a. Any project for improvement of a structure to correct existing violations of state or
local health, sanitary, or safety code specifications which have been identified by the
local code enforcement official and which are the minimum necessary to assure safe
living conditions (provided that said code deficiencies were not caused by neglect or
lack of maintenance on the part of the current or previous owners) or;
b. Any alteration of a “historic structure”, provided that the alteration will not preclude
the structure’s continued designation as a “historic structure”.
Substantially improved existing manufactured home parks or subdivisions is where the repair,
reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds 50
percent of the value of the streets, utilities and pads before the repair, reconstruction or
improvement commenced.
[fflower values are used in the definition above for “Substantial improvement”, then include
the same lower values for stricter standards for this definition] .
Suspension means the removal, with or without probation, of a participating community from the
NFIP because the community failed to adopt and enforce the compliant floodplain management
regulations required for participation in the NFIP.
Yariance means a grant of relief from the requirements of this ordinance which permits
construction in a manner otherwise prohibited by this ordinance.
d
Violation means the failure of a structure or other development to be fully compliant with the
community's floodplain management regulations. A structure or other development without the
elevation certificate, other certifications, or other evidence of compliance required in the Code of
Federal Regulations (CFR) §44, Sec. 60.3(6)(5), ()(4), (c)(10), (d)(3), (e)(2), (e)(4), or (e)(5) and
corresponding parts of this ordinance is presumed to be in violation until such time as that
documentation is provided.
Watercourse means any flowing body of water including a river, creek, stream, or a branch.
Water surface elevation means the height, in relation to the National Geodetic Vertical Datum
(NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, (or other datum, where
specified) of floods of various magnitudes and frequencies in the floodplains of coastal or riverine
areas.
Wet floodproofing means a method of construction which allows water to enter a structure in such
a way that will minimize damage to the structure and its contents. Wet floodproofing is appropriate
Jor functionally dependent use and uses that facilitate open space use by variance only, structures
utilized for parking or limited storage, or when all other techniques are not technically feasible.
Wet floodproofing shall not be utilized as a method to satisfy the requirements of this ordinance for
bringing substantially damaged or improved structures into compliance. Wet floodproofing is not
allowed in lieu of complying with the lowest floor elevation requirements for new residential
buildings.
2/7/2019 pe | 33
Page 34
= FLOOD DAMAGE PREVENTION ORDINANCE
X Zones (shaded) are areas of 0.2 percent chance flood that are outside of the SFHA subject to the
one percent chance flood with average depths of less than one foot, or with contributing drainage
area less than one square mile, and areas protected by certified levees from the base flood.
f
X Zones (unshaded) are areas determined to be outside the 0.2 percent chance floodplain.
Zone means a geographical area shown on a Flood Hazard Boundary Map or a Flood Insurance
Rate Map that reflects the severity or type of flooding in the area.
ARTICLE 7
SEVERABILITY
If any section, clause, sentence, or phrase of this Ordinance is held to be invalid or
unconstitutional by any court of competent jurisdiction, then said holding shall in no way effect
the validity of the remaining portions of this Ordinance.
+
Ordinance adopted on
Jon 2
Date May 20,2020
City Council
_OSSTAENuiagis - Yeah Jeat)-Yeah,
Loewen May fev - fea
Lar oarmtbn Ru d baad (ON ~ Yeah
Seu eera Marerse Camp bell ~ en eal
2/7/2019 ° pg | 34